01ARTICLE

Why analysis, constructible modelling, fabrication drawings and site erection must be managed as one technical workflow.

Define the scope correctly

A successful steel project starts with reliable inputs: intended use, spans, equipment loads, site conditions, corrosion exposure and applicable standards. Unresolved inputs usually become expensive revisions later.

Build a constructible model

Structural analysis must be connected to fabrication and erection. A coordinated 3D model makes connections, secondary steel, platforms, stairs and equipment interfaces visible before production.

Deliver controlled information

Shop and erection drawings must communicate dimensions, welds, bolts, levels and part positions without ambiguity. Model checks, clash reviews and revision records keep the workshop and site aligned.